| Storrs & Regional Campuses: | Project # | Phase | Approved | Budget | Primary $ Funding Source |
|---|---|---|---|---|---|
| Academic and Research Facilities – Gant Building STEM Renovations | 901803 | Revised Final | 9/17/25 | $278,500,000 | UCONN 2000; University Funds |
| Academic and Research Facilities – Homer Babbidge Library Renovations | 300008 | Construction Complete | 3/27/19 | $5,700,000 | UCONN 2000 |
| Academic and Research Facilities – STEM Research Center Science 1 | 901802 | Final | 4/29/20 | $220,000,000 | UCONN 2000 |
| Albert N. Jorgensen and Harriet S. Jorgensen Theatre and Performing Arts Center Envelope and Various Site Improvements | FO501954 | Final | 6/25/25 | $1,064,595 | University Funds |
| Alumni Center Wood Shake Roof Replacement | FO500132 | Final | 6/25/25 | $782,000 | University Funds |
| Alumni Residence Halls Roof Replacement | 300298 | Revised Final | 5/13/25 | $2,450,000 | UCONN 2000; University Funds |
| Andover Infrastructure and Software Upgrade Phases I Through VI | FO500073 | Revised Final | 6/25/25 | $4,855,439 | University Funds |
| Athletics District Development | 201696 | Construction Complete | 3/27/19 | $96,600,000 | UCONN 2000; Revenue Bonds; Gift Funds; University Funds |
| Avery Point Housing Development | 300306 | Planning | 4/23/25 | $750,000 | University Funds |
| Avery Point Parking Lots A and B Upgrades | FO502081 | Revised Final | 2/25/26 | $2,410,000 | University Funds |
| Avery Point Seawall Exigent Improvement | FO500157 | Final | 12/7/22 | $3,063,069 | UCONN 2000 |
| B4 Steam Vault and Line Exigent Repair | 300247 | Revised Final | 6/29/22 | $7,700,000 | UCONN 2000; University Funds |
| Babbidge Library Stairs and Doors | FO502282 | Revised Final | 12/11/24 | $1,004,300 | University Funds |
| Boiler Plant Equipment Replacement and Utility Tunnel Connection | 300151 | Revised Final | 6/25/25 | $46,500,000 | UCONN 2000 |
| Branford House Exterior Repairs, Phases 1, 2 and 3 | FO500106 | Revised Final | 6/25/25 | $1,645,000 | University Funds |
| Buckley Hall Remediation and Refurbishment | FO502330 FO502343 FO502339 FO502341 | Final | 4/17/24 | $1,500,000 | University Funds |
| Central Utility Plant Equipment Replacement and Pumping Project | 902109 | Construction Complete | 8/2/17 | $23,000,000 | UCONN 2000; University Funds |
| Cogen Cooling Towers 7-8-9 | 300322 | Final | 12/3/25 | $3,000,000 | University Funds |
| Cogen Emergency Generators | 300320 | Design | 12/3/25 | $1,000,000 | University Funds |
| Cooling Water Pumps Upgrade | 300321 | Final | 12/3/25 | $2,300,000 | University Funds |
| Coventry Boathouse | 300246 | Revised Final | 12/3/25 | $4,950,000 | UCONN 2000; University Funds |
| Dining Hall Facilities Ventilation Upgrades | FO500010 | Final | 2/21/18 | $892,700 | University Funds |
| Electric System Protective Relay Replacement | TBD | Final | 12/3/25 | $750,000 | University Funds |
| Electric Vehicle Charging Infrastructure and Service Upgrades | FO502039 | Final | 9/27/23 | $957,200 | University Funds |
| Energy Savings Performance Contract Phase 2 Investment Grade Energy Audit | FO502072 | Planning | 12/6/23 | $500,000 | Renewable Energy Fund |
| Environmental Land Use Restriction (ELUR) – Lots F & C | 300285 | Final | 12/3/25 | $1,225,000 | UCONN 2000 |
| Fenton River Well Field and Road Replacement | 901653 | Final | 4/19/23 | $1,700,000 | UCONN 2000 |
| Field House – Old Rec Center Renovation | 300209 | Revised Final | 10/30/24 | $90,000,000 | University Funds; UCONN 2000; Gift Funds |
| Foster Hall Flood Damage Abatement & Restoration | FO503125 | Final | 9/17/25 | $1,365,100 | University Funds |
| Façade and Roof Repairs Program | TBD | Final | 2/25/26 | $10,000,000 | UCONN 2000 |
| Freitas Renovation | 300252 | Revised Final | 7/17/24 | $3,250,000 | Gift Funds; UCONN 2000 |
| Gampel Ground Floor KSI Heat Lab | TL2582 | Final | 9/25/24 | $975,000 | University Funds |
| Gampel Pavilion Court Replacement | FO500158 | Final | 12/7/22 | $688,480 | University Funds |
| Gampel Pavilion Enhancements | TBD | Final | 4/17/24 | $10,000,000 | State GO Funds |
| Gampel Pavilion Generator Replacement | FO500063 | Revised Final | 2/25/26 | $643,000 | University Funds |
| Gampel Pavilion Renovation | 300284 | Revised Final | 12/3/25 | $99,400,000 | UCONN 2000 |
| Garrigus Suites Environmental Systems Upgrade | FO502396 | Final | 4/17/24 | $620,000 | University Funds |
| George C. White Building Roof & Drainage System | FO500127 | Revised Final | 12/3/25 | $1,485,800 | University Funds |
| Gilbert Road Site Preparation | 300235 | Final | 8/3/22 | $6,600,000 | UCONN 2000 |
| Greer Field House Indoor Track Resurfacing | FO500159 | Final | 12/7/22 | $807,092 | University Funds |
| Hockey Arena | 300133 | Final | 4/27/21 | $70,000,000 | University Funds; Revenue Bonds; Gift Funds |
| Homer Babbidge Library HVAC Equipment Upgrades Phase 1, 2 & 3 | FO501861 | Revised Final | 9/17/25 | $1,220,000 | University Funds |
| Housing Refresh Program Summer 2025 | FO502796 | Final | 2/26/25 | $12,000,000 | University Funds |
| Housing Refresh Program Summer 2026 | FO503123 | Final | 9/17/25 | $14,000,000 | University Funds |
| Hydrogen Fuel Dispenser | FO502031 | Final | 9/27/23 | $835,500 | University Funds |
| I-Lot Improvements | 300173 | Final | 4/27/21 | $7,000,000 | UCONN 2000 |
| Innovation Partnership Building (IPB) Renovations for the Center for Clean Energy Engineering (C2E2) | 300254-TL2547 | Final | 6/26/24 | $24,000,000 | UCONN 2000 |
| Jones Annex Renovation | 300203-TL2540 | Revised Final | 10/29/25 | $9,850,000 | UCONN 2000; University Funds |
| McMahon Residence Hall and Dining Facility Roof Replacements | 300299 | Final | 2/26/25 | $1,965,000 | UCONN 2000; University Funds |
| Mirror Lake Improvements | 300174 | Final | 6/26/24 | $11,500,000 | UCONN 2000 |
| Motor Pool Fuel Tank Replacement | 300301 | Final | 2/25/26 | $3,100,00 | UCONN 2000 |
| Music Building Roof Replacement | FO500131 | Revised Final | 4/23/25 | $759,000 | University Funds |
| Nathan L. Whetten Graduate Center 3rd Floor Renovation | TL2572 | Revised Final | 2/26/25 | $648,000 | University Funds |
| New Commissary Building | 300172 | Design | 12/3/25 | $2,500,000 | University Funds |
| North Eagleville Road and Discovery Drive Intersection Improvements | 300169 | Revised Final | 04/27/22 | $3,000,000 | UCONN 2000 |
| Northwest Quad: Science 1-Site Improvements and Tunnel Phase 2 | 300050 | Final | 4/29/20 | $56,000,000 | UCONN 2000 |
| Northwest Residential Area – Thermal Comfort Improvements | 300280 | Revised Final | 9/17/25 | $22,750,000 | University Funds |
| Northwest Science Quad Infrastructure, Phase I | 902115 | Construction Complete | 8/1/18 | $20,750,000 | UCONN 2000 |
| North and South Parking Garage Restoration Phase 1, 2, 3, and 4 | FO500056 | Revised Final | 12/6/23 | $4,000,000 | University Funds |
| Parking Lot L Pavement | 300316 | Final | 2/25/26 | $1,255,00 | University Funds |
| Peace Garden (formerly known as Reflection Garden) | 300267 | Final | 4/23/25 | $1,240,000 | Gift Funds; University Funds |
| Pharmacy Biology Building (PBB) Research Support Expansion | 300249 | Final | 6/25/25 | $10,000,000 | UCONN 2000 |
| Practice Field Upgrades | 300326 | Final | 2/25/26 | $4,946,500 | UCONN 2000 |
| Public Safety Building Renovations | 201703 | Revised Final | 6/29/22 | $7,750,000 | UCONN 2000; University Funds |
| Residential Life Facilities – Hicks and Grange Student Room and Common Area Renovations | 300163 | Construction Complete | 4/28/21 | $1,875,000 | UCONN 2000 |
| Residential Life Facilities – South Campus Residence Hall | 300200 | Final | 8/3/22 | $215,000,000 | UCONN 2000; Revenue Bonds; University Funds |
| School of Nursing Building | 300260 | Final | 10/30/24 | $100,000,000 | State GO Bond Funds; UCONN 2000; Gift Funds |
| South Campus Infrastructure | 300241 | Revised Final | 9/27/23 | $89,500,000 | UCONN 2000 |
| Sprague Hall Remediation and Refurbishment | FO502344 FO502351 FO502345 | Final | 4/17/24 | $1,050,000 | University Funding |
| Stamford Abutting Property Remediation | 300149 | Revised Final | 4/23/25 | $2,850,000 | UCONN 2000 |
| Stamford Parking Garage Demolition | 300021 | Construction Complete | 4/24/19 | $10,000,000 | UCONN 2000 |
| Storrs Campus Primary Electrical Feed 5P Upgrade | 300317 | Final | 12/3/25 | $8,800,000 | UCONN 2000 |
| Storrs Campus – Underground Storage Tank (UST) Replacement | FO502851 | Final | 4/23/25 | $580,000 | University Funds |
| Storrs LED (SLED) Lighting Upgrade | FO500025 | Revised Final | 12/9/20 | $7,850,000 | University Funds |
| Student Health and Wellness Suite at Avery Point Campus | 300276 | Final | 6/25/25 | $850,000 | University Funds |
| Supplemental Utility Plant | 300025 | Final | 2/26/20 | $67,000,000 | UCONN 2000 |
| Tasker Admissions Building Roof Restoration | FO500082 | Final | 10/28/20 | $662,040 | University Funds |
| UCONN 2000 Code Remediation: Stamford Downtown Relocation | 201523 | Final | 2/24/21 | $22,000,000 | UCONN 2000; University Funds |
| UConn Hartford Café | 300262 | Final | 12/11/24 | $1,100,000 | University Funds |
| UConn Tennis Facility | 300257 | Final | 9/25/24 | $3,450,000 | Gift Funds; UCONN 2000 |
| UConn Waterbury at 36 North Main Street | 300275 | Final | 9/25/24 | $1,250,000 | UCONN 2000 |
| University Second Electrical Feed | 300136 | Revised Final | 6/25/25 | $18,000,000 | UCONN 2000 |
| Voice Over Internet Protocol (VoIP) Implementation and 5ESS Decommissioning | TBD | Final | 6/25/25 | $4,000,000 | UCONN 2000 |
| von der Mehden Recital Hall Roof Restoration | FO501881 | Final | 4/17/24 | $720,000 | University Funds |
| Werth Family Basketball Champions Center Dining Renovation | TL2323 | Final | 6/30/21 | $1,268,000 | University Funds |
| Werth Family Basketball Champions Center Hall of Fame | FO500024 | Construction Complete | 4/28/21 | $3,537,000 | University Funds; Gift Funds |
| Werth Residence Tower High Humidity Mitigation | 300251 | Revised Final | 2/26/25 | $11,100,000 | UCONN 2000; University Funds |
| Whitney Road Steam Improvements E–8 to Q–8 | 300281 | Final | 12/11/24 | $8,500,000 | UCONN 2000 |
| Wilbur Cross Cupola Repair | FO500161 | Final | 10/25/23 | $932,000 | University Funds |
| Wired Access Layer Cabling FY25 | Various | Final | 6/26/24 | $2,000,000 | UCONN 2000 |
| Wired Access Layer Infrastructure Refresh – Phase 1 | Various | Construction Complete | 8/14/19 | $6,000,000 | UCONN 2000; University Funds |
| Wired Access Layer Infrastructure Refresh – Phase 2 | Various | Final | 6/24/20 | $4,200,000 | UCONN 2000; University Funds |
| Wired Access Layer Infrastructure Refresh – Phase 3 | Various | Final | 9/29/21 | $4,000,000 | UCONN 2000 |
| Wired Access Layer Infrastructure Refresh – Phase 4 | Various | Final | 6/29/22 | $2,000,000 | UCONN 2000 |
| Wired Access Layer Infrastructure Refresh – Phase 5 | Various | Final | 6/28/23 | $2,000,000 | UCONN 2000 |
| XL Center – Academic Space Renovation | 300270 | Final | 4/17/24 | $1,039,000 | State GO Bond Funds |
| UConn Health: | Project # | Phase | Approved | Budget | Primary $ Funding Source |
| 16 Munson Road Emergency Lighting & Egress -Upgrades | 21-010 | Final | 9/27/23 | $1,900,000 | UCONN 2000 Phase III DM; UCH Capital Funds |
| 5 Munson Road Clinical Fit-Out | 22-042 | Revised Final | 9/27/23 | $8,380,000 | UCH Capital; Landlord Tenant Fit Out Allowance |
| 836 Hopmeadow Street, Simsbury Clinical Practice Relocation | 21-036 | Revised Final | 9/27/23 | $4,729,000 | UCH Capital; Landlord Tenant Fit Out Allowance |
| Anatomic Pathology and Autopsy Renovation | 21-059 | Final | 12/6/23 | $1,175,000 | UCH Capital |
| ASB Data Center Generator and Power Improvements | 23-601.04 | Final | 6/26/25 | $3,180,000 | FY 23 State GO Bond Funds; UCONN 2000 Phase III DM |
| BB013 Animal Research MRI Renovation | 24-023 | Revised Final | 9/17/25 | $1,042,000 | FY23 State GO Bond Funds (Equipment); UCH Research IDC Capital; UCH School of Medicine Operating Funds |
| Building D & Building N Roof Replacement | 22-601.02 | Final | 6/28/23 | $2,500,000 | UCONN 2000 |
| Building E & Building K Roof Replacement | 22-601.01 | Revised Final | 2/26/25 | $4,560,000 | FY 23 GO Bond Funds; UCONN 2000 |
| Building F & Building M Roof Replacement | 22-601.05 22-601.10 | Final | 6/26/24 | $1,615,000 | FY 23 State GO Bond Funds |
| Cadaver Lab Renovation and Air Handling Unit Replacement | 23-601.12 | Final | 9/27/23 | $2,960,000 | UCONN 2000 |
| Canzonetti (F) Building Wound Care Center Renovation | 22-019 | Revised Final | 9/25/24 | $1,330,000 | UCH Capital; Restorix Health Inc Design & Construction Allowance |
| Cardio Catheterization (Cath) Lab Equipment Replacement & Renovation | 19-017 | Planning | 3/30/22 | $3,700,000 | UCH Capital |
| Lab Medicine Multiple Lab Renovation | 24-601.05 | Design | 2/25/26 | $4,000,000 | FY 23 GO Bond Funds; UCONN 2000 |
| Cell & Genome Sciences Building Data Center Cooling System Upgrades | 23-601.07 | Final | 9/27/23 | $840,000 | UCONN 2000 |
| Central Sterile Washer & Sterilizer Replacement | 21-034 | Revised Final | 2/25/26 | $8,425,000 | UCH Capital; FY 23 GO Bond Funds; UCONN 2000 |
| CGSB and ARB Autoclave and Washer Replacement | 22-012 | Final | 12/7/22 | $1,200,000 | UCH Research IDC Capital |
| CGSB Chemical Storage Area Renovation | 23-601.17 | Final | 9/17/25 | $690,000 | FY23 GO Bond Funds |
| Connecticut Tower – 2nd Floor Geriatric Psychology Relocation | 26-010 | Final | 12/3/25 | $1,500,000 | UCH Capital |
| Connecticut Tower – 6th Floor Infusion Center | 25-020 | Revised Final | 12/3/25 | $1,400,000 | UCH Capital |
| Connecticut Tower (CT) 7th Floor Med-Surg/Observation Unit Renovation | 23-027 | Final | 2/28/24 | $2,500,000 | UCH Capital |
| Connecticut Tower Infrastructure Upgrade | 24-601.11 | Planning | 6/25/25 | $34,300,000 | FY 23 State GO Bond Funds; FY 24 State GO Bond Funds |
| Cryo Electron Microscope Installation | 22-055 | Final | 9/25/24 | $2,086,000 | UCH Research IDC Capital |
| CT-7 Inpatient and Research Renovations | 23-007 | Planning | 6/26/24 | $1,675,000 | UCH School of Medicine Operating Funds; UCONN 2000 Phase III DM; UCH Capital; UConn Foundation |
| Electro Physiology (EP) Lab Equipment Replacement & Renovation | 22-017 | Final | 12/7/22 | $6,430,000 | UCH Capital |
| Emergency Department Low Acuity Expansion | 23-025 | Final | 6/25/25 | $1,350,000 | UCH Capital |
| Energy Improvements: Steam Pipe and Trap Insulation | 26-700.01 | Final | 2/25/26 | $925,000 | UCH Energy Conservation Pool; CT Natural Gas Rebate |
| Fluoroscopy Equipment Replacement and Renovation | 21-009 | Revised Final | 9/25/24 | $1,020,000 | UCH Capital |
| Garage 1, 2 & 3 Electric Vehicle Charger Installation | 21-066 | Revised Final | 9/25/24 | $620,000 | UCH Energy Conservation Pool; CT DEEP VW Grant; Eversource Rebate |
| Health Information Management (HIM) Workplace Improvements | 21-019 | Final | 2/22/23 | $763,000 | UCONN 2000 |
| Hybrid OR#2 Fit-out | 23-035 | Final | 12/11/24 | $6,750,00 | UCH Capital |
| Interventional Radiology Equipment Replacement & Renovation | 20-001 | Final | 2/26/25 | $8,700,000 | FY 23 GO Bond Funds; UCH Capital |
| IT Disaster Recovery Room | 23-601.06 | Final | 2/26/25 | $1,600,000 | FY 23 State GO Bond Funds; UCONN 2000 Phase III DM |
| KB034-036 Research Lab Renovation | 24-011 | Revised Final | 9/17/25 | $2,100,000 | UCH School of Medicine Operating Funds; UCONN 2000 Phase III DM |
| Labor & Delivery Infant Protection System Replacement | 21-022 | Final | 9/17/25 | $760,000 | UCONN 2000 Phase III DM; FY23 GO Equipment Bond Funds |
| LINAC Unit Replacement (formerly Tomotherapy Unit Replacement) | 20-058 | Final | 2/26/25 | $5,580,000 | UCH Capital Funds |
| Main Building Lab Area Renovations – 1st Floor | 24-035 | Planning | 6/26/24 | $11,900,000 | FY23 State GO Bond Funds; UCH Research IDC Capital; UCH School of Medicine Operating Funds |
| Main Building Lab Area Renovations – 2nd Floor | 22-013 | Final | 12/7/22 | $10,200,000 | UCONN 2000; UCH Research IDC Capital; UCH Operating Funds; UCH Capital Funds |
| Main Liquid Oxygen Tank Replacement | 24-601.07 | Final | 6/25/25 | $925,000 | FY 23 GO Bond Funds |
| Main Lobby Entrance Renovation | 23-601.10 | Design | 2/25/26 | $2,100,000 | UCONN 2000; FY 23 State GO Bond Funds |
| Muscular Skeletal Institute Chiller Replacement | 23-601.20 | Final | 9/27/23 | $570,000 | UCONN 2000 |
| Musculoskeletal Institute Rehabilitation Expansion | 23-029 | Final | 2/28/24 | $1,010,000 | UCH Capital |
| New England Sickle Cell Institute Renovation | 21-063 | Revised Final | 9/17/25 | $5,960,000 | UCH Capital; UCONN 2000 |
| New PET/CT Scanner Installation | 21-032 | Planning | 9/17/25 | $5,675,000 | UCH Capital |
| Outpatient Pavilion 3rd Floor Backfill | 22-060 | Final | 2/28/24 | $4,250,000 | UCH Capital |
| Outpatient Pavilion X-Ray & Blood Draw Relocation | 22-046 | Final | 2/28/24 | $1,925,000 | UCH Capital |
| Parking Lots L1 and A5 Repaving | 22-601.08 | Revised Final | 9/17/25 | $1,390,000 | FY23 State GO Bond Funds |
| Psychiatry Seclusion Suite & Nurse Station Security Renovation | 21-050 | Revised Final | 6/25/25 | $1,470,000 | UCH Capital Funds |
| Replace Building F and H Hot Water Tanks | 19-603.11 | Revised Final | 9/28/22 | $845,000 | UCONN 2000 |
| Replace Chilled Water Pump CHWP#4 | 21-018 | Final | 12/8/21 | $642,000 | UCONN 2000; UCH Capital Funds |
| School of Dental Medicine 24/7 Student Random Access Lab Renovation | 24-032 | Planning | 9/25/24 | $830,000 | UCH Capital Funds |
| Southington Clinic Expansion | 23-045 | Final | 9/25/24 | $1,900,000 | UCH Capital Funds; Landlord Tennant Allowance |
| Surgery Center Operating Room #6 Renovations | 24-018 | Design | 2/25/26 | $2,500,000 | UCH Capital Funds |
| TB-121 Blood Bank Relocation | 23-010 | Revised Final | 9/25/24 | $1,125,000 | UCH Capital Funds; CIRP |
| TM416 MRI Upgrade and Mobile Unit | 25-013 | Revised Final | 2/25/26 | $2,360,000 | UCH Capital Funds |
| Torrington Clinic Practice Relocation | 24-028 | Revised Final | 2/25/26 | $4,920,000 | UCH Capital Funds; Landlord Fit-Out Allowance |
| Transitional Nursery Renovation | 21-016 | Final | 6/28/23 | $1,800,000 | UCH Capital Funds |
| Underground Fuel Tank C1 Removal and Replacement | 24-601.03 | Final | 2/26/25 | $925,000 | UCONN 2000 Phase III DM |
| University Tower 7th Floor Pharmacy Fit-Out | 23-024 | Planning | 9/27/23 | $10,250,000 | UCH Capital Funds; FY 23 State GO Bond Funds |