Capital Project Budget List as of 2/25/2026

Storrs & Regional Campuses:Project #PhaseApprovedBudgetPrimary $ Funding Source
Academic and Research Facilities – Gant Building STEM Renovations901803Revised Final9/17/25$278,500,000UCONN 2000; University Funds
Academic and Research Facilities – Homer Babbidge Library Renovations300008Construction Complete3/27/19$5,700,000UCONN 2000
Academic and Research Facilities – STEM Research Center Science 1901802Final4/29/20$220,000,000UCONN 2000
Albert N. Jorgensen and Harriet S. Jorgensen Theatre and Performing Arts Center Envelope and Various Site Improvements
FO501954Final6/25/25$1,064,595University Funds
Alumni Center Wood Shake Roof ReplacementFO500132Final6/25/25$782,000University Funds
Alumni Residence Halls Roof Replacement
300298Revised Final5/13/25$2,450,000UCONN 2000; University Funds
Andover Infrastructure and Software Upgrade Phases I Through VIFO500073 Revised Final6/25/25$4,855,439University Funds
Athletics District Development201696Construction Complete3/27/19$96,600,000UCONN 2000; Revenue Bonds; Gift Funds; University Funds
Avery Point Housing Development300306Planning4/23/25$750,000University Funds
Avery Point Parking Lots A and B UpgradesFO502081Revised Final2/25/26$2,410,000University Funds
Avery Point Seawall Exigent ImprovementFO500157Final12/7/22$3,063,069UCONN 2000
B4 Steam Vault and Line Exigent Repair300247Revised Final6/29/22$7,700,000UCONN 2000;
University Funds
Babbidge Library Stairs and Doors
FO502282Revised Final12/11/24$1,004,300University Funds
Boiler Plant Equipment Replacement and Utility Tunnel Connection300151Revised Final6/25/25$46,500,000UCONN 2000
Branford House Exterior Repairs, Phases 1, 2 and 3FO500106Revised Final6/25/25$1,645,000University Funds
Buckley Hall Remediation and Refurbishment
FO502330
FO502343
FO502339
FO502341
Final4/17/24$1,500,000University Funds
Central Utility Plant Equipment Replacement and Pumping Project902109Construction Complete8/2/17$23,000,000UCONN 2000; University Funds
Cogen Cooling Towers 7-8-9
300322Final12/3/25$3,000,000University Funds
Cogen Emergency Generators
300320Design12/3/25$1,000,000University Funds
Cooling Water Pumps Upgrade
300321Final12/3/25$2,300,000University Funds
Coventry Boathouse
300246Revised Final12/3/25$4,950,000UCONN 2000; University Funds
Dining Hall Facilities Ventilation UpgradesFO500010Final 2/21/18$892,700University Funds
Electric System Protective Relay Replacement
TBDFinal12/3/25$750,000University Funds
Electric Vehicle Charging Infrastructure and Service UpgradesFO502039Final9/27/23$957,200University Funds
Energy Savings Performance Contract Phase 2 Investment Grade Energy Audit
FO502072Planning12/6/23$500,000Renewable Energy Fund
Environmental Land Use Restriction (ELUR) – Lots F & C
300285Final12/3/25$1,225,000UCONN 2000
Fenton River Well Field and Road Replacement901653Final4/19/23$1,700,000UCONN 2000
Field House – Old Rec Center Renovation300209Revised Final10/30/24$90,000,000University Funds; UCONN 2000; Gift Funds
Foster Hall Flood Damage Abatement & Restoration
FO503125Final9/17/25$1,365,100University Funds
Façade and Roof Repairs ProgramTBDFinal2/25/26$10,000,000UCONN 2000
Freitas Renovation300252Revised Final7/17/24$3,250,000Gift Funds; UCONN 2000
Gampel Ground Floor KSI Heat Lab
TL2582
Final9/25/24$975,000University Funds
Gampel Pavilion Court ReplacementFO500158Final12/7/22$688,480University Funds
Gampel Pavilion Enhancements
TBDFinal4/17/24$10,000,000State GO Funds
Gampel Pavilion Generator ReplacementFO500063Revised Final2/25/26$643,000University Funds
Gampel Pavilion Renovation
300284Revised Final12/3/25$99,400,000UCONN 2000
Garrigus Suites Environmental Systems UpgradeFO502396Final4/17/24$620,000University Funds
George C. White Building Roof & Drainage SystemFO500127Revised Final12/3/25$1,485,800University Funds
Gilbert Road Site Preparation300235Final8/3/22$6,600,000UCONN 2000
Greer Field House Indoor Track ResurfacingFO500159Final12/7/22$807,092University Funds
Hockey Arena300133
Final4/27/21
$70,000,000
University Funds; Revenue Bonds; Gift Funds
Homer Babbidge Library HVAC Equipment Upgrades Phase 1, 2 & 3
FO501861Revised Final9/17/25$1,220,000University Funds
Housing Refresh Program Summer 2025FO502796Final2/26/25$12,000,000University Funds
Housing Refresh Program Summer 2026
FO503123Final9/17/25$14,000,000University Funds
Hydrogen Fuel DispenserFO502031Final9/27/23$835,500University Funds
I-Lot Improvements300173Final4/27/21$7,000,000UCONN 2000
Innovation Partnership Building (IPB) Renovations for the Center for Clean Energy Engineering (C2E2)300254-TL2547Final6/26/24$24,000,000UCONN 2000
Jones Annex Renovation300203-TL2540Revised Final10/29/25$9,850,000UCONN 2000; University Funds
McMahon Residence Hall and Dining Facility Roof Replacements
300299Final2/26/25$1,965,000UCONN 2000; University Funds
Mirror Lake Improvements300174Final6/26/24$11,500,000UCONN 2000
Motor Pool Fuel Tank Replacement
300301Final2/25/26$3,100,00UCONN 2000
Music Building Roof Replacement
FO500131Revised Final4/23/25$759,000University Funds
Nathan L. Whetten Graduate Center 3rd Floor RenovationTL2572Revised Final2/26/25$648,000University Funds
New Commissary Building
300172Design12/3/25$2,500,000University Funds
North Eagleville Road and Discovery Drive Intersection Improvements300169Revised Final04/27/22$3,000,000UCONN 2000
Northwest Quad: Science 1-Site Improvements and Tunnel Phase 2300050Final4/29/20$56,000,000UCONN 2000
Northwest Residential Area – Thermal Comfort Improvements
300280Revised Final9/17/25$22,750,000University Funds
Northwest Science Quad Infrastructure, Phase I902115Construction Complete8/1/18$20,750,000UCONN 2000
North and South Parking Garage Restoration Phase 1, 2, 3, and 4FO500056Revised Final 12/6/23$4,000,000University Funds
Parking Lot L Pavement300316Final2/25/26$1,255,00University Funds
Peace Garden (formerly known as Reflection Garden)300267Final4/23/25$1,240,000Gift Funds; University Funds
Pharmacy Biology Building (PBB) Research Support Expansion
300249Final6/25/25$10,000,000UCONN 2000
Practice Field Upgrades300326Final2/25/26$4,946,500UCONN 2000
Public Safety Building Renovations201703Revised Final6/29/22$7,750,000UCONN 2000; University Funds
Residential Life Facilities – Hicks and Grange Student Room and Common Area Renovations300163
Construction Complete4/28/21
$1,875,000
UCONN 2000
Residential Life Facilities – South Campus Residence Hall300200Final8/3/22$215,000,000UCONN 2000; Revenue Bonds; University Funds
School of Nursing Building300260Final10/30/24$100,000,000State GO Bond Funds; UCONN 2000; Gift Funds
South Campus Infrastructure300241Revised Final9/27/23$89,500,000UCONN 2000
Sprague Hall Remediation and Refurbishment
FO502344
FO502351
FO502345
Final4/17/24$1,050,000University Funding
Stamford Abutting Property Remediation300149Revised Final4/23/25$2,850,000UCONN 2000
Stamford Parking Garage Demolition300021Construction Complete4/24/19$10,000,000UCONN 2000
Storrs Campus Primary Electrical Feed 5P Upgrade
300317Final12/3/25$8,800,000UCONN 2000
Storrs Campus – Underground Storage Tank (UST) Replacement
FO502851Final4/23/25$580,000University Funds
Storrs LED (SLED) Lighting UpgradeFO500025Revised Final12/9/20$7,850,000University Funds
Student Health and Wellness Suite at Avery Point Campus
300276Final6/25/25$850,000University Funds
Supplemental Utility Plant300025Final2/26/20$67,000,000UCONN 2000
Tasker Admissions Building Roof RestorationFO500082Final10/28/20$662,040University Funds
UCONN 2000 Code Remediation: Stamford Downtown Relocation201523Final2/24/21$22,000,000UCONN 2000; University Funds
UConn Hartford Café
300262Final12/11/24$1,100,000University Funds
UConn Tennis Facility
300257Final9/25/24$3,450,000Gift Funds; UCONN 2000
UConn Waterbury at 36 North Main Street300275Final9/25/24$1,250,000UCONN 2000
University Second Electrical Feed300136Revised Final6/25/25$18,000,000UCONN 2000
Voice Over Internet Protocol (VoIP) Implementation and 5ESS Decommissioning
TBDFinal6/25/25$4,000,000UCONN 2000
von der Mehden Recital Hall Roof RestorationFO501881Final4/17/24$720,000University Funds
Werth Family Basketball Champions Center Dining RenovationTL2323Final6/30/21$1,268,000University Funds
Werth Family Basketball Champions Center Hall of Fame FO500024Construction Complete4/28/21$3,537,000University Funds; Gift Funds
Werth Residence Tower High Humidity Mitigation
300251Revised Final2/26/25$11,100,000UCONN 2000; University Funds
Whitney Road Steam Improvements E–8 to Q–8
300281Final12/11/24$8,500,000UCONN 2000
Wilbur Cross Cupola RepairFO500161Final10/25/23$932,000University Funds
Wired Access Layer Cabling FY25
VariousFinal6/26/24$2,000,000UCONN 2000
Wired Access Layer Infrastructure Refresh – Phase 1VariousConstruction Complete8/14/19$6,000,000UCONN 2000; University Funds
Wired Access Layer Infrastructure Refresh – Phase 2VariousFinal6/24/20$4,200,000UCONN 2000; University Funds
Wired Access Layer Infrastructure Refresh – Phase 3VariousFinal9/29/21$4,000,000UCONN 2000
Wired Access Layer Infrastructure Refresh – Phase 4
VariousFinal6/29/22$2,000,000UCONN 2000
Wired Access Layer Infrastructure Refresh – Phase 5VariousFinal6/28/23$2,000,000UCONN 2000
XL Center – Academic Space Renovation300270Final4/17/24$1,039,000State GO Bond Funds
UConn Health:Project #PhaseApprovedBudgetPrimary $ Funding Source
16 Munson Road Emergency Lighting & Egress
-Upgrades
21-010Final9/27/23$1,900,000UCONN 2000 Phase III DM; UCH Capital Funds
5 Munson Road Clinical Fit-Out22-042Revised Final9/27/23$8,380,000UCH Capital; Landlord Tenant Fit Out Allowance
836 Hopmeadow Street, Simsbury Clinical Practice Relocation21-036Revised Final9/27/23$4,729,000UCH Capital; Landlord Tenant Fit Out Allowance
Anatomic Pathology and Autopsy Renovation
21-059Final12/6/23$1,175,000UCH Capital
ASB Data Center Generator and Power Improvements
23-601.04Final6/26/25$3,180,000FY 23 State GO Bond Funds; UCONN 2000 Phase III DM
BB013 Animal Research MRI Renovation
24-023Revised Final9/17/25$1,042,000FY23 State GO Bond Funds (Equipment); UCH Research IDC Capital; UCH School of Medicine Operating Funds
Building D & Building N Roof Replacement22-601.02Final6/28/23$2,500,000UCONN 2000
Building E & Building K Roof Replacement22-601.01Revised Final2/26/25$4,560,000FY 23 GO Bond Funds; UCONN 2000
Building F & Building M Roof Replacement
22-601.05
22-601.10
Final6/26/24$1,615,000FY 23 State GO Bond Funds
Cadaver Lab Renovation and Air Handling Unit Replacement23-601.12Final9/27/23$2,960,000UCONN 2000
Canzonetti (F) Building Wound Care Center Renovation22-019Revised Final9/25/24$1,330,000UCH Capital; Restorix Health Inc Design & Construction Allowance
Cardio Catheterization (Cath) Lab Equipment Replacement & Renovation19-017Planning3/30/22$3,700,000UCH Capital
Lab Medicine Multiple Lab Renovation
24-601.05Design2/25/26$4,000,000FY 23 GO Bond Funds; UCONN 2000
Cell & Genome Sciences Building Data Center Cooling System Upgrades23-601.07Final9/27/23 $840,000UCONN 2000
Central Sterile Washer & Sterilizer Replacement21-034Revised Final2/25/26$8,425,000UCH Capital; FY 23 GO Bond Funds; UCONN 2000
CGSB and ARB Autoclave and Washer Replacement22-012Final12/7/22$1,200,000UCH Research IDC Capital
CGSB Chemical Storage Area Renovation
23-601.17Final9/17/25$690,000FY23 GO Bond Funds
Connecticut Tower – 2nd Floor Geriatric Psychology Relocation
26-010Final12/3/25$1,500,000UCH Capital
Connecticut Tower – 6th Floor Infusion Center
25-020Revised Final12/3/25$1,400,000UCH Capital
Connecticut Tower (CT) 7th Floor Med-Surg/Observation Unit Renovation23-027Final2/28/24$2,500,000UCH Capital
Connecticut Tower Infrastructure Upgrade
24-601.11Planning6/25/25$34,300,000FY 23 State GO Bond Funds; FY 24 State GO Bond Funds
Cryo Electron Microscope Installation22-055Final9/25/24$2,086,000UCH Research IDC Capital
CT-7 Inpatient and Research Renovations
23-007Planning6/26/24$1,675,000UCH School of Medicine Operating Funds; UCONN 2000 Phase III DM; UCH Capital; UConn Foundation
Electro Physiology (EP) Lab Equipment Replacement & Renovation22-017Final12/7/22$6,430,000UCH Capital
Emergency Department Low Acuity Expansion
23-025Final6/25/25$1,350,000UCH Capital
Energy Improvements: Steam Pipe and Trap Insulation26-700.01Final2/25/26$925,000UCH Energy Conservation Pool; CT Natural Gas Rebate
Fluoroscopy Equipment Replacement and Renovation21-009Revised Final9/25/24$1,020,000UCH Capital
Garage 1, 2 & 3 Electric Vehicle Charger Installation
21-066Revised Final9/25/24$620,000UCH Energy Conservation Pool; CT DEEP VW Grant; Eversource Rebate
Health Information Management (HIM) Workplace Improvements21-019Final2/22/23$763,000UCONN 2000
Hybrid OR#2 Fit-out
23-035Final12/11/24$6,750,00UCH Capital
Interventional Radiology Equipment Replacement & Renovation20-001Final2/26/25$8,700,000FY 23 GO Bond Funds; UCH Capital
IT Disaster Recovery Room23-601.06Final2/26/25$1,600,000FY 23 State GO Bond Funds; UCONN 2000 Phase III DM
KB034-036 Research Lab Renovation
24-011Revised Final9/17/25$2,100,000UCH School of Medicine Operating Funds; UCONN 2000 Phase III DM
Labor & Delivery Infant Protection System Replacement21-022Final9/17/25$760,000UCONN 2000 Phase III DM; FY23 GO Equipment Bond Funds
LINAC Unit Replacement (formerly Tomotherapy Unit Replacement)20-058Final2/26/25$5,580,000UCH Capital Funds
Main Building Lab Area Renovations – 1st Floor

24-035Planning6/26/24$11,900,000FY23 State GO Bond Funds; UCH Research IDC Capital; UCH School of Medicine Operating Funds
Main Building Lab Area Renovations – 2nd Floor22-013Final12/7/22$10,200,000UCONN 2000; UCH Research IDC Capital; UCH Operating Funds; UCH Capital Funds
Main Liquid Oxygen Tank Replacement
24-601.07Final6/25/25$925,000FY 23 GO Bond Funds
Main Lobby Entrance Renovation23-601.10Design2/25/26$2,100,000UCONN 2000; FY 23 State GO Bond Funds
Muscular Skeletal Institute Chiller Replacement23-601.20Final9/27/23$570,000UCONN 2000
Musculoskeletal Institute Rehabilitation Expansion23-029Final2/28/24$1,010,000UCH Capital
New England Sickle Cell Institute Renovation21-063Revised Final9/17/25$5,960,000UCH Capital; UCONN 2000
New PET/CT Scanner Installation
21-032Planning9/17/25$5,675,000UCH Capital
Outpatient Pavilion 3rd Floor Backfill22-060Final2/28/24$4,250,000UCH Capital
Outpatient Pavilion X-Ray & Blood Draw Relocation22-046Final2/28/24$1,925,000UCH Capital
Parking Lots L1 and A5 Repaving
22-601.08Revised Final9/17/25$1,390,000FY23 State GO Bond Funds
Psychiatry Seclusion Suite & Nurse Station Security Renovation21-050Revised Final6/25/25$1,470,000UCH Capital Funds
Replace Building F and H Hot Water Tanks19-603.11Revised Final9/28/22$845,000UCONN 2000
Replace Chilled Water Pump CHWP#421-018Final12/8/21$642,000UCONN 2000; UCH Capital Funds
School of Dental Medicine 24/7 Student Random Access Lab Renovation
24-032Planning9/25/24$830,000UCH Capital Funds
Southington Clinic Expansion
23-045Final9/25/24$1,900,000UCH Capital Funds; Landlord Tennant Allowance
Surgery Center Operating Room #6 Renovations
24-018Design2/25/26$2,500,000UCH Capital Funds
TB-121 Blood Bank Relocation23-010Revised Final9/25/24$1,125,000UCH Capital Funds; CIRP
TM416 MRI Upgrade and Mobile Unit
25-013Revised Final2/25/26$2,360,000UCH Capital Funds
Torrington Clinic Practice Relocation24-028Revised Final2/25/26$4,920,000UCH Capital Funds; Landlord Fit-Out Allowance
Transitional Nursery Renovation21-016Final6/28/23$1,800,000UCH Capital Funds
Underground Fuel Tank C1 Removal and Replacement
24-601.03Final2/26/25$925,000UCONN 2000 Phase III DM
University Tower 7th Floor Pharmacy Fit-Out23-024Planning9/27/23$10,250,000UCH Capital Funds; FY 23 State GO Bond Funds